Standardized leak testing of sewers and laterals

Sewer systems must be watertight to protect both the soil and the groundwater from contamination from sewage. Pipes must be tested during the construction phase, after completion and over the entire operating period. The test method and the test medium (air/water) are selected on the basis of applicable standards and depending on each specific case. Leak testing is carried out either on the entire system or separately in individual areas.

The following solutions are suitable for leak testing of pipes, joints, pipe sockets and laterals from main sewers.

Suitable system for leak testing in sewer systems:

Vehicle system for main sewer and lateral inspection with pressure testing system

The IBAK vehicle system for main sewer and lateral inspection provides inspection data from main sewers, laterals and manholes as well as data on leak tightness.

To the system