Professional rehabilitation of sewers and laterals

In the event of damage in a sewer system, rehabilitation becomes necessary in order to restore its functionality and extend its useful life. This is to prevent both extraneous water from infiltrating and placing additional load on the sewer system and sewage from exfiltrating and contaminating the groundwater and the soil.

For the rehabilitation of sewer systems, there are a variety of procedures (repair/renovation/replacement), object-specific requirements and corresponding applicable technical regulations.

The following cutting and rehabilitation systems can be electrically or pneumatically driven and have a range of specific use and application options.

Suitable systems for the rehabilitation of sewer systems:

MicroGator vehicle system

The IBAK vehicle system for electric cutting and rehabilitation tasks in main sewers.

  • Effective cutting: Through precise control of the cutting process
  • Reliable in operation: Power-driven and low-noise operation
  • Safe investment: Flexible and future-proof thanks to modular system design
  • Added value: Installation of top hats and sleeves, grouting, ultra-high-pressure cutting and inspection
  • Ready for immediate use: Turnkey solution

To the system

MicroGator Air

The IBAK system for pneumatic cutting and rehabilitation tasks in main sewers.

  • Effective cutting: Through precise control of the cutting process
  • Reliable in use: Pneumatic and powerful
  • Safe investment: Flexible and future-proof thanks to modular system design
  • Added value: Installation of top hats and sleeves, ultra-high-pressure cutting and inspection
  • Variable use: In a vehicle and as a mobile rehabilitation system

To the system